With the roof done they’ve moved on to the siding. There’s a lot going on inside, too. HVAC ducts are going up and the fire sprinkler pipes are being hung from the ceiling. The low voltage wires for the phones, computer network, and security system have been run. Electrical wiring in the interior walls is also about done and will be inspected tomorrow. They wrapped up the plumbing a few days ago so now the sheetrock can be hung in the next few days.
Tomorrow is a big day. Pouring of concrete curbs will begin and PG&E will hook up the main panel to the transformer they installed almost a month ago. No more generators!