Posted on

Textured Siding Going Up

With the roof done they’ve moved on to the siding. There’s a lot going on inside, too. HVAC ducts are going up and the fire sprinkler pipes are being hung from the ceiling. The low voltage wires for the phones, computer network, and security system have been run. Electrical wiring in the interior walls is also about done and will be inspected tomorrow. They wrapped up the plumbing a few days ago so now the sheetrock can be hung in the next few days. Tomorrow is a big day. Pouring of concrete curbs will begin and PG&E will hook up the main panel to the transformer they installed almost a month ago. No more generators! IMG_2955 IMG_2956 IMG_2957 IMG_2963 IMG_2965 IMG_2968