Building Shell Complete

We’ve been incredibly busy the last few weeks and I’ve fallen behind on my building posts.  I’ll try to get caught up over the next few days. Here are pics of the second floor windows and siding going up. IMG_3020 IMG_3023 IMG_3029 IMG_3031 IMG_3040 IMG_3049 IMG_3051

Second Floor Windows

With some of the second floor windows and a few panels of the siding you start to get an idea of what the showroom building is going to look like. IMG_3015 IMG_3018

Future Embroidery Department

The new embroidery department will be three times the size of of our existing one. The walls have been insulated and the sheetrock will be done in the next couple of days. IMG_2994 IMG_2998 IMG_3001 IMG_3002 IMG_3003

Textured Siding Going Up

With the roof done they’ve moved on to the siding. There’s a lot going on inside, too. HVAC ducts are going up and the fire sprinkler pipes are being hung from the ceiling. The low voltage wires for the phones, computer network, and security system have been run. Electrical wiring in the interior walls is also about done and will be inspected tomorrow. They wrapped up the plumbing a few days ago so now the sheetrock can be hung in the next few days. Tomorrow is a big day. Pouring of concrete curbs will begin and PG&E will hook up the main panel to the transformer they installed almost a month ago. No more generators! IMG_2955 IMG_2956 IMG_2957 IMG_2963 IMG_2965 IMG_2968

Curbs and Roofs

Today the break room roof got finished and the warehouse roof is over half done. Curbs are laid out so now we can see where the planters will be. I’m also posting some additional outside shots. By tomorrow night it should look quite a bit different.   IMG_2920IMG_2923IMG_2931IMG_2933IMG_2937IMG_2938IMG_2940IMG_2942IMG_2944